Skip to content

Treasure Island: Post-Production

Any assistance in striking the set after the show and loading it into the van to be taken back to the Hut will be most appreciated.  The show should finish around 21.30 or 21.45 on Saturday night (1st Dec) and we will spend an hour to 90 mins taking down as much of the set as we can.  It’s a sad day when we have to dismantle such a beautiful set, but that’s the way it goes!

All hands needed on-deck at the theatre on Sunday 2nd Dec, from 9am, to load up the vans and unlaod back at the Hut.  The more the merrier and the quicker we can all get back to our warm beds!

Then on Sunday 16th December at 7.30pm we have a post-production meeting at Brook Hall to discuss all aspects of the show.  This is our chance to learn to do things better each time and the input of all cast and crew is welcome.

Post a Comment

Your email is never published nor shared. Required fields are marked *

Bad Behavior has blocked 656 access attempts in the last 7 days.